What are the gas cylinder rules in India?

India regulates gas cylinders mainly through the Gas Cylinders Rules, 2016. The Central Government made them under sections 5 and 7 of the Explosives Act, 1884, and PESO (the Chief Controller of Explosives, Nagpur) administers them. They came into force on 22 November 2016 (G.S.R. 1081(E)), replacing the Gas Cylinders Rules, 2004. They have been amended nine times, most recently on 5 June 2026, and one further draft is pending.

Approach: I checked the PESO approval registers in our datasets, which list approved cylinder makers and testing stations but not the text of the Rules. I then read the Rules, the 2025 and 2026 amendments and the PESO FAQ on the PESO website. I did not read every page of the Schedules (I to VI) or the 2018–July 2025 amendments, so the points below come from the rule text, the November 2025 and 2026 amendments, and the FAQ.

Scope (rule 2)

  • A "gas cylinder" is a closed metal container of more than 500 ml and not more than 1,000 litres used to store and transport compressed gas. It includes composite cylinders, cryogenic containers, and fuel tanks fitted to motor vehicles.
  • The November 2025 amendment (G.S.R. 839(E)) added LNG containers and compressed hydrogen cylinders. It allows hydrogen, CNG, nitrogen and compressed-air cylinders up to 3,000 litres, provided the diameter is 60 cm or less for nitrogen and air, and 80 cm or less for hydrogen and CNG.
  • "Compressed gas" is gas whose pressure exceeds 1.5 kgf/cm² gauge at +15 °C, or 2 kgf/cm² gauge at +50 °C (or both), including cryogenic liquids.

Approval of cylinders, valves and regulators (rules 3–5)

  • Rule 3(1): No person shall fill, import, possess or transport a cylinder filled (or meant to be filled) with compressed gas unless:
    • the cylinder and valve are built to a type and standard in Schedule I; and
    • the inspecting authority's test and inspection certificates have been given to the Chief Controller, and his prior approval obtained.
  • Making cylinders, valves, LPG regulators or other fittings needs Chief Controller approval (rule 3(4)). The application includes Schedule III particulars, design drawings endorsed by the inspecting authority, and the Schedule V fee.
    • First approval runs for one year and can be extended.
    • Foreign manufacturers need 10 years' manufacturing experience and a proven track record, and their plants are re-evaluated every five years.
  • Valve standards (rule 4) include:
    • IS 3224 for industrial and CNG on-board cylinders;
    • IS 3745 for medical cylinders;
    • IS 8776 or IS 8737 for LPG cylinders (water capacity up to 5 litres or above 5 litres);
    • IS 9798 for LPG regulators.
  • Valve outlet threads: valves for flammable gases not listed in IS 3224 must have left-hand threads; all other valves have right-hand threads.
  • Safety relief devices: cylinders for obnoxious or poisonous gases (for example chlorine, phosgene and hydrogen sulphide) shall not have any safety relief device (rule 5(2)).

Marking, colour and labels (rules 6–9)

  • Stamped markings on the cylinder: manufacturer, specification, heat treatment, last hydrostatic test date and testing station code, working and test pressure, tare weight and water capacity. Also "H" for hydrogen and embrittling gases, and an expiry date on CNG cylinders and auto-LPG containers.
  • Colours: identification colours follow IS 4379 (industrial), IS 3933 (medical) and IS 15683 or IS 2878 (fire extinguishers). No person may change a cylinder's colour.
  • Labels: each cylinder must show the gas name and the filler's name and address, plus the standard "WARNING" text. Export cylinders carry the gas name by UN number in line with ISO 7225.

Handling, storage and transport (rules 10–28, Schedule VI)

  • Filled cylinders may be delivered only to licence holders, or to people exempt from licensing (rule 10).
  • Seamless cylinders: leaks in the body may not be repaired (rule 11).
  • Welded cylinders: only minor defects may be repaired, under the controls in rule 12.
  • Prohibited around cylinders:
    • no workers under 18 or intoxicated persons (rule 13);
    • no smoking or mobile phones near flammable-gas cylinders (rules 14, 18);
    • no oil or lubricant on valves (rule 15).
  • Positioning and storage:
    • LPG and other liquefiable-gas cylinders must always be kept upright;
    • LPG and dissolved-gas cylinders must not be stacked horizontally;
    • flammable and toxic gases must be stored apart from each other and from other gases.
  • Transport: follow Schedule VI, which includes:
    • no transport by bicycle or motorised two-wheeler;
    • flammable-gas cylinders not carried with other compressed gases;
    • toxic gases not carried with foodstuffs;
    • acetylene not carried in closed vehicles.
  • Re-testing: a cylinder due for periodic re-test shall not be filled or transported until it has been re-tested (rule 26).
  • Conversion to another gas needs Chief Controller approval (rule 28). The exception is inert gas, oxygen and air cylinders converted under ISO 11621.

Import (rules 29–34)

  • Import needs a Form D licence, granted for up to one year (rules 29 and 51(1)).
  • By sea, the ship must give the port at least 48 hours' notice, and the Commissioner of Customs must permit landing.
  • Import by land needs Central Government sanction in each case; import by air needs DGCA sanction in each case.
  • Customs permission no longer needed (April 2026, G.S.R. 315(E)): for empty cylinders without valves, and for valves and LPG regulators from PESO-approved foreign plants that have a valid Form D licence.
  • Non-Schedule I cylinders:
    • Such cylinders imported only to be filled and shipped back to the country of origin, or supplied to foreign-going ships, may be filled (rule 3(5)).
    • The same April 2026 amendment extends this to cylinders and valves imported by the Ministry of Defence, the Department of Space and their PSUs for their own use.
  • PESO FAQ: only PESO-approved foreign cylinders may be imported, and only by the manufacturer's Indian distributor.

Testing and condemnation (rules 35–36)

  • Cylinders must pass hydrostatic and other Schedule IV tests within the periods in IS 15975. The PESO FAQ gives every 10 years for LPG cylinders.
  • Testing stations are first approved for one year, extendable to 10 years, and must hold ISO accreditation.
  • A cylinder must be destroyed if it:
    • fails a test;
    • loses more than 5% of its tare weight;
    • is unsafe; or
    • has passed its service life.
  • Service life: 20 years for CNG cylinders; 15 years for low-carbon-steel auto-LPG containers, unless the code specifies otherwise.

Filling and storage licences (rules 43–58)

  • Licence needed (rule 43): no person shall fill a cylinder with compressed gas, or possess filled cylinders, without a licence.
    • Form E covers filling, Form F storage, and Form G CNG dispensing stations.
    • Prior approval of plans is needed (rule 47). Licences run up to 10 years, to 30 September (rules 51, 55). PESO now takes applications through the National Single Window System.
  • No licence needed, for own use only and not for sale (rule 44):
    • flammable non-toxic gas: up to 25 cylinders or 200 kg, whichever is less;
    • non-flammable non-toxic gas: up to 200 cylinders;
    • toxic gas: up to 5 cylinders;
    • dissolved acetylene: up to 25 cylinders.
  • LPG:
    • No licence is needed for up to 100 kg at a time for own use, distribution or sale from an oil marketing company dealer's sales room.
    • Manifold installations are also exempt if they meet IS 6044 Part 1.
  • District authority NOC (rule 48) has been deleted by the Gas Cylinders (Second Amendment) Rules, 2026 (G.S.R. 447(E), 5 June 2026). The PESO FAQ (2024), which still refers to NOCs, predates this.
  • The same amendment added condition 8A to Form F: the licensing authority may permit higher stacking and narrower gangways for industrial gas cylinders packed in certified racks or cages.

Amendment history and pending draft

  • Amendments listed in the June 2026 notification:

    • G.S.R. 189(E) (27 Feb 2018) and 231(E) (15 Mar 2018);
    • G.S.R. 44(E) (23 Jan 2019) and 44(E) (20 Jan 2022);
    • G.S.R. 225(E) (11 Apr 2025), 386(E) (9 or 16 June 2025: the notices give both dates) and 501(E) (28 Jul 2025);
    • G.S.R. 839(E) (12 Nov 2025);
    • G.S.R. 315(E) (27 Apr 2026).
  • Pending draft: the Gas Cylinders (Third Amendment) Rules, 2026 (G.S.R. 461(E), 10 June 2026) would add condition 22 to Form G for CNG Mobile Refuelling Units. Its main points:

    • units owned by an authorised city gas distribution company;
    • a cascade working pressure of 200 bar gauge or less;
    • safety distances of 4–5 m;
    • use limited to mines, ports, railways and vessels, with no public retail use.

    It is a draft and is not yet in force.

Approved suppliers in PESO registers

PESO publishes lists of approved CNG cylinder manufacturers (for example Everest Kanto Cylinder Ltd, Tarapur [1]) and LPG cylinder testing stations [2]. The MSIHC Rules, 1989 name the Chief Controller of Explosives as the authority enforcing the gas cylinder rules made under the Explosives Act, though the version I found still cites the 1981 rules [3].

I can go through any Schedule (for example the Schedule V fees or Schedule IV test methods) or a specific licence form in detail.

Sources:

Q.02

When do businesses need a cylinder storage licence?

A business needs a storage licence (Form F) whenever it holds filled compressed-gas cylinders above the small own-use quantities exempted by rule 44 of the Gas Cylinders Rules, 2016. Rule 43(1) says "no cylinder filled with compressed gas shall be possessed by anyone except under and in accordance with the conditions of a licence granted under these rules." Any stock held for sale or trading needs a licence, whatever the size; only rule 44(c) lets an oil marketing company's LPG dealer or distributor keep up to 100 kg of LPG for sale without one.

Approach: The text of the Rules is not in our datasets (they hold only PESO's approval registers), so I read rules 43 to 55 in the official Gazette text on the PESO website, the June 2026 amendment, and PESO's 2024 FAQ. The PESO copy of the Rules is the 2016 text. I did not read each 2018 to July 2025 amendment, but the 2024 FAQ (which postdates the 2018 to 2022 ones) gives the same LPG limit.

When no licence is needed (rule 44)

SituationExempt up to ("at a time")
A carrier or other person holding filled cylinders to transport them under the RulesNo limit stated
Own use, not for sale or trading: flammable, non-toxic gas25 cylinders or 200 kg of gas, whichever is less
Own use: non-flammable, non-toxic gas (for example nitrogen, argon, CO₂)200 cylinders
Own use: toxic gas5 cylinders
Own use: dissolved acetylene25 cylinders
LPG (rule 44(c)): own use, distribution, or sale from a sales room belonging to an oil marketing company's dealer or distributor100 kg of gas in total
LPG cylinders connected directly to a manifold at a working placeNo licence, but the installation shall meet IS 6044 Part 1 and stay within its quantity limits

Rule 44(c) says the own-use limits in 44(b) "shall not be applicable" to LPG, so LPG is assessed against the 100 kg figure.

Practical triggers for a Form F licence:

  • More cylinders or gas on site than the limits above, for example a 26th flammable-gas cylinder, more than 200 kg of flammable gas, or a 6th toxic-gas cylinder.
  • Any storage for sale or trading, since the 44(b) exemptions cover only cylinders "for own use and not meant for sale or trading". The only exception is the LPG dealer allowance in 44(c).
  • Importers: under rule 29(4), if imported filled cylinders exceed the rule 44 quantities, "licence to store compressed gas in cylinders granted in Form F is obligatory." The PESO FAQ also lists an Indian Form E&F or Form F licence among the documents needed for a Form D import licence.
  • Filling cylinders always needs a licence (Form E); rule 44 exempts possession only.

Getting and keeping the licence

  • Plan approval first (rule 47): submit plans to scale, in triplicate, showing the premises and everything within 100 m, with the scrutiny fee. After inspection, the licensing authority endorses the licence, and it comes into force on that date (rule 50(4)).
  • Who grants it: the Chief Controller of Explosives or a Controller he authorises. Applications go in on Form C through the National Single Window System, according to the PESO FAQ.
  • District Magistrate NOC: rule 48 required one for a Form F licence to store flammable, toxic or corrosive gases for sale or trading. The Gas Cylinders (Second Amendment) Rules, 2026 (G.S.R. 447(E), 5 June 2026) omitted rule 48, so the PESO FAQ's NOC answers are out of date.
  • Validity (rules 51 and 55): a licence runs to 30 September of its final year, for a maximum of 10 years, and can be renewed for up to 10 years at a time. If the renewal application reaches PESO by the expiry date, the licence is deemed to stay in force until PESO decides. An application up to three months late costs twice the normal fee.
  • Changes: you cannot alter licensed premises without prior plan approval, and altered areas cannot be used until the licence is amended (rule 53).
  • New Form F condition 8A (June 2026): for industrial gas cylinders, the licensing authority "may" permit higher stacking and narrower gangways if the cylinders are in certified racks or cages that meet national or international codes.
  • Fees (Schedule V): Form F storage fees depend on gas type and quantity. For example, the non-toxic, non-flammable band is set at 500 cylinders, and LPG bands run from 100 kg upwards.

I can set out the full Schedule V fee bands for Form F, or the Form C document list.

Sources:

Q.03

What approvals and testing do cylinders and valves need?

Every cylinder and valve must be built to a type and standard in Schedule I, and the Chief Controller of Explosives (PESO) must approve it in advance on the strength of an inspecting authority's test and inspection certificates. Making cylinders, valves or LPG regulators needs a separate approval as a manufacturer. After that, no cylinder may be filled until it has been examined and passed a hydrostatic (or hydrostatic stretch) test and the other Schedule IV tests, at a PESO-recognised testing station, within the periods set by IS 15975. These are rules 3, 4, 35 and 36 of the Gas Cylinders Rules, 2016.

Approach: Our datasets hold PESO's approval registers but not the text of the Rules, so I read the official Gazette text (G.S.R. 1081(E)) on the PESO site and the November 2025 and April 2026 amendments. PESO's copy of the Rules is the original 2016 text, and I did not read each amendment from 2018 to July 2025.

1. Approval to fill, import, possess or transport (rule 3(1)–(3))

  • Basic rule: no person shall fill a cylinder with compressed gas, or import, possess or transport one that is filled or meant to be filled, unless:

    • (a) the cylinder and its valve are built to a type and standard in Schedule I; and
    • (b) the inspecting authority's test and inspection certificates for the cylinder and valve have been given to the Chief Controller, and his prior approval obtained.
  • What the application includes (rule 3(2)):

    • the number and serial numbers of the cylinders;
    • the manufacturer;
    • the cylinder and valve specifications;
    • any previous approval;
    • the cylinder and valve test certificates;
    • the Schedule V scrutiny fee. This is ₹1,000 for the first 100 cylinders plus ₹2,000 for each further 500, or ₹1,000 flat for export fills.
  • What the inspecting authority's certificate must show (Schedule II):

    • For cylinders: specification, minimum wall thickness, heat treatment, design working pressure, the hydrostatic or stretch test pressure with a record for each cylinder, the pneumatic test result, tare weight and water capacity, and the chemical and physical properties of the steel.
    • For valves: the hydrostatic and pneumatic proof tests, tensile strength, elongation and the quantities accepted or rejected.
  • Exception (rule 3(5)): cylinders that do not meet Schedule I may still be filled in three cases:

    • they are imported to be filled and shipped back to the country of origin;
    • they are supplied to foreign-going ships calling at Indian ports;
    • since G.S.R. 315(E) of 27 April 2026, they are cylinders and valves imported by Ministry of Defence establishments, the Department of Space and its PSUs for their own use.

    In all three cases, the cylinder must have passed its hydrostatic or stretch test within the prescribed period at the test pressure marked on it, and must not be overfilled.

2. Manufacturer approval (rule 3(3)–(4))

  • Who needs it: anyone who wants to make cylinders, valves, LPG regulators attached to self-closing valves, multi-function valves or other fittings "shall obtain approval from the Chief Controller."
  • The application: the Schedule III particulars, design drawings and calculations endorsed by the inspecting authority, and the scrutiny fee.
  • Schedule III particulars include:
    • the manufacturing process and the quality-control checks at each stage;
    • test and NDT equipment (radiography, ultrasonic, dye-penetrant, magnetic particle);
    • the independent inspecting authority;
    • whether the unit holds ISO or equivalent certification.
  • Procedure: the Chief Controller may allow a prototype to be produced. PESO technical officers and the inspecting authority may then evaluate the plant and witness the prototype's type tests. Approval is granted "initially for a period of one year", which may be extended once a satisfactory performance report is received.
  • Foreign manufacturers:
    • PESO considers their proven track record, 10 years' manufacturing experience and wide market share.
    • They pay extra evaluation fees.
    • If approval is given without an inspection, permission is provisional until the plant is evaluated.
    • Their units are re-evaluated every five years.
  • Fees (Schedule V):
Indian makerForeign maker
First unit approval (one year)₹10,000₹6,50,000
New design₹2,000₹65,000
Design change₹1,000₹13,000
Annual renewal₹2,000₹32,500

3. Valve requirements (rules 4 and 7)

  • Standards: valves "shall comply in all respects" with:
Cylinder or fittingStandard
Industrial gas and CNG on-board cylindersIS 3224
Medical gas cylindersIS 3745
Breathing apparatusIS 7302
LPG cylinders up to 5 litresIS 8776
LPG cylinders over 5 litresIS 8737
Auto-LPG containersIS 15100
Small refrigerant cylindersIS 12300
LPG regulatorsIS 9798
Cryogenic containersCodes accepted by the Chief Controller

The Chief Controller "may", in the public interest, permit non-conforming valves and regulators.

  • CO₂ cylinder valves: must have a soft copper bursting disc that bursts between 200 and 220 kg/cm².
  • Outlet threads: left-hand for flammable gases not listed in IS 3224; right-hand for all others.
  • Fitting: the valve must be screwed into the cylinder neck, with no permanent attachment and no adapter in between. The spindle must not be removable in normal operation.
  • Markings on the valve (rule 7):
    • specification;
    • month or quarter and year of manufacture;
    • maker's symbol;
    • working pressure;
    • gas name or symbol;
    • "L.H." for left-hand threads;
    • inspector's stamp;
    • dip-tube length, where a dip tube is fitted.
  • Safety relief devices (rule 5):
    • on Indian-made cylinders, they must meet IS 5903;
    • on foreign cylinders, they are maintained to the original specification;
    • cylinders for obnoxious or poisonous gases (for example chlorine, phosgene, H₂S, HF and CO) shall not have any.
  • Imported valves and regulators: need an approval or Form D licence (rule 29(2)). Since April 2026, Customs permission to land is not needed for valves and regulators from PESO-approved foreign plants that hold a valid Form D licence, or for empty cylinders without valves (rule 32(1) proviso).

4. Periodic examination and testing (rule 35, Schedule IV)

  • The obligation (rule 35(1)): no person shall fill a cylinder unless it has been examined and given a hydrostatic or hydrostatic stretch test, plus the other Schedule IV tests, within the period in IS 15975 or as the Chief Controller approves in writing.
  • Re-test due (rule 26): a cylinder that is due for re-test shall not be charged or transported until the re-test is done.
  • After fire exposure (rule 24): a cylinder must be examined and hydrotested before use, and heat-treated first if the fire may have damaged the material. A fire-damaged dissolved acetylene cylinder is condemned outright.
  • Test procedure (Schedule IV, Part B):
    1. Empty the cylinder safely, assuming it still holds gas. Use nitrogen purging to check for an obstructed valve.
    2. Clean it by steam or approved solvent. Rust is removed by shot blasting, wire brushing, or burn-out at 300 °C or less for no more than one hour.
    3. Examine it visually, outside and as far as practicable inside, to IS 5845, IS 8451, IS 13258 or ISO 11623.
    4. Pressure-test it:
Cylinder typeTest
Permanent gases, high-pressure liquefiable gases, all toxic and corrosive gasesHydrostatic stretch test to IS 5844, pressure held for at least 30 seconds. Permanent stretch must not exceed 10% of total stretch.
Low-pressure non-corrosive liquefiable gases (for example LPG)Hydrostatic test to IS 5844 by the non-jacket method, held for at least 30 seconds, without measuring volume change.
Cryogenic containersPneumatic test at 1.1 times design pressure.

Any pressure drop, leak, visible bulge or deformation counts as a failure.

  1. Dry the cylinder and stamp the tester's code mark (registered with PESO) and the test date on the neck.
  2. Record the test on the cylinder's history card: maker and owner, serial number, specification, test and working pressures, water capacity, any tare-weight variation, shell condition, gas and valve type.
  • Markings that follow (rule 6): the cylinder carries the date of its last test and the testing station's code mark. LPG cylinders also show the quarter and year of the test. CNG cylinders and auto-LPG containers carry an expiry date.

5. Recognition of testing stations (rule 35(2)–(4), Schedule IV Part A)

  • Applying: a testing station must provide the Schedule IV facilities and apply to the Chief Controller with the scrutiny fee: ₹10,000 the first time (one-year validity), then ₹2,000 a year.
  • Facilities rule 35(3) requires: cylinder evacuation, neutralisation or scrubbing for toxic and corrosive gases, and condemnation.
  • Degassing area:
    • a degassing and valve-opening platform of at least 3 × 3 m with water and cold flaring;
    • a 2 m industrial fence;
    • a 30 m clearance for LPG;
    • a vent stack at least 6 m high, 15 m away, for CNG, hydrogen and other flammable gases;
    • no more than five cylinders degassed at a time.
  • Equipment:
    • IS 5844 hydrostatic rig measuring permanent volume change to 1/20,000 of capacity;
    • two pressure gauges of at least 15 cm, one used as the test gauge and one as the master gauge;
    • ultrasonic or acoustic-emission NDT;
    • a boroscope;
    • hardness tester;
    • stamped test weights;
    • a painting booth.
  • Calibration: working gauges every month; master gauge every six months; weighing equipment checked daily; test weights every two years.
  • Staff:
    • a manager qualified in mechanical or chemical engineering;
    • supervisors aged 21 or over with at least two years' testing experience;
    • trained operators.
  • Quality system: stations testing seamless steel or composite cylinders must hold ISO quality-system certification.
  • Validity: approval runs for one year at first and can be extended to up to 10 years. Extension requires a valid ISO accreditation certificate, the station's test records and the fee. The same applies to approval for hot repair or reconditioning of LPG and welded cylinders.

6. Repair and condemnation (rules 11, 12, 36)

  • Seamless cylinders: no repair of body leaks.
  • Welded or brazed cylinders:
    • a leak anywhere other than a seam means the cylinder shall be rendered unserviceable;
    • minor defects (dents, foot rings, valve guards) may be repaired by a certified welder at a maker's or PESO-approved premises;
    • after repair, the cylinder is heat-treated, radiographed if that was originally required, and re-tested as at manufacture;
    • it may not be refilled until PESO has the repair report and gives permission;
    • dissolved acetylene cylinders with weld-seam leaks may not be repaired.
  • Condemnation (rule 36): a cylinder that fails the test, loses more than 5% of its tare weight, is otherwise unsafe, or has passed its service life "shall not be filled" and shall be destroyed to IS 8198. Destruction means flattening it, or cutting it so the pieces cannot be re-joined, after its markings are defaced and the owner is told. The testing station does this.
    • Service life is 20 years for CNG cylinders and 15 years for low-carbon-steel auto-LPG containers, unless the code says otherwise.
    • Closed history records are kept for two years and reported to PESO each quarter (1 January, April, July and October).
  • Conversion to another gas (rule 28): needs Chief Controller approval. Inert gas, oxygen and air cylinders of the same design are exempt if converted under ISO 11621 with the owner's consent.

7. Who appears in PESO's approval registers

PESO publishes registers of approved makers and testing stations. Examples:

  • CNG cylinder makers: Everest Kanto Cylinder Ltd, Tarapur [1].
  • Safety-fitting makers: Fainger Leser Valves (P) Ltd, Mumbai, for safety relief valves [4].
  • LPG cylinder testing stations: for example Bharat Cylinder Testing and Painting Centre, Jabalpur [2] and Vishal Testing and Services, Chennai [5].

The Rules note that PESO keeps the up-to-date list of all approvals on peso.gov.in.

I can pull a full list from any of these registers, for example every testing station recognised in a given state.

Sources:

Q.04